Error message

Notice: Undefined index: und in include() (line 207 of sites/all/themes/Porto_sub/node--feed-item.tpl.php).

EIA derives new estimate of New England nuclear plant utilization">EIA derives new estimate of New England nuclear plant utilization

(Mon, 24 Jun 2019) EIA adjusted its New England nuclear regional utilization rate on June 13, 2019, to account for the permanent closure of the Pilgrim Nuclear Power Station (Pilgrim) on May 31, 2019. New England has two remaining operating nuclear power plants—the Seabrook Station nuclear power plant in New Hampshire (summer-rated plant capacity of 1,251.4 megawatts) and the Millstone Nuclear Power Station in Connecticut (summer-rated plant capacity of 2,073.1 megawatts).

Leave a comment

Filtered HTML

  • Web page addresses and e-mail addresses turn into links automatically.
  • Allowed HTML tags: <a> <em> <strong> <cite> <blockquote> <code> <ul> <ol> <li> <dl> <dt> <dd>
  • Lines and paragraphs break automatically.

Plain text

  • No HTML tags allowed.
  • Web page addresses and e-mail addresses turn into links automatically.
  • Lines and paragraphs break automatically.